Quote:
Originally Posted by
akebrake
β‘οΈ
Looks like the room have changed dimensions. Which are the new ones?
How do you deal with heating/ ventilation?
Thanks for the reply! The dimensions are still as pictured in the schematic. The GoPro tends to make objects it records appear larger than they actally are
Regarding ventilation I got 2 big parallel windows in the left wall wich can be opened if the smoke gets too dense. I hope this will suffice.
I checked out the post you posted, the treatment looks good, but unfortunetally due to previously mentioned window, and also the windows in the vocalbooth, such treatment won't be possible in my situation.
I have about 40cm from the front (listening position) wall untill I hit the vocalbooth window. I can kind of work around this (as mentioned above) by working around the window in order to achive corners of about 60x60 cm in case of triangles.
So, basically my options for the control room are:
1: triangles of 60x60cm maximum
2: squares of 40x40-80cm maximum
3: an extra wall of 40x300cm covering the entire front (listening postition) wall
Does any of these sound convincing?