Moving on with the ceiling:
First the side, rising up to the middle of the control room with angle according to drawing. Also time to make the holes for the AC / heater ducts.
Ooohh is that me working?
The middle section is a stepped ceiling. We also had to make the provision to fit the large diffusors later (the green chipboard):
All cavaties stuffed with leftovers of Homatherm:
There are the ducts, large diameter for slow airspeed and thus little noise. TIt has worked excellent, you can not hear it working:
Evereything covered with double layers of gypsum, and middle section also wth roofing. Time to start the frame for the homatherm: